Cheney High and Betz Elementary Pedestrian and Bicycle Route Safety Project
The project consists installation of new sidewalks, multi-use paths, ADA curb ramps, concrete driveways, ultra- reflective transverse crosswalks, rectangular rapid flashing beacons, radar speed signs/driver feedback signs, and relocate bike lanes.
Addendum #1
(click to expand/collapse)

Name | Size | |||
CHS and Betz Elementary SRTS Addendum 1 2020-08-12 | 167.9 KB |
Addendum #2
(click to expand/collapse)

Name | Size | |||
CHS and Betz Elementary SRTS Addendum 2 with attachments | 868.4 KB |
Addendum #3
(click to expand/collapse)

Name | Size | |||
CHS and Betz Elementary SRTS Addendum 3 2020-08-25 | 951.7 KB |