Cheney High and Betz Elementary Pedestrian and Bicycle Route Safety Project
The project consists installation of new sidewalks, multi-use paths, ADA curb ramps, concrete driveways, ultra- reflective transverse crosswalks, rectangular rapid flashing beacons, radar speed signs/driver feedback signs, and relocate bike lanes.
Plan Holders
Date | Company | Contact | Bid Categories |
8/14/20 8:16 am |
Colvico Inc.
2812 N. Pittsburg Spokane, WA 99207 |
Tom Baldwin
Tel: 509-536-1875
Fax: 509-534-3551
|
2. Sub Contractor |
8/18/20 1:23 pm |
D-McP Construction
15522 N Chronicle Ct Mead, WA 99021 |
David McPherson
Project Manager
Tel: 5099511997
|
|
8/13/20 8:57 am |
Inland Asphalt Company
5111 E Broadway Ave Spokane Valley, WA 99212 |
Jamie Tibbits
Contract Administrator
Tel: 509-534-2657
Fax: 509-536-3137
|
2. Sub Contractor |
8/13/20 11:29 am |
Mercer Technologies Firm
1501 E.15th Ave #115 Gary, IN 46402 |
Garrett Mercer
Tel: 219-885-9811
|
1. General Contractor |
8/13/20 8:57 am |
Parametrix
835 North Post, Suite 201 Spokane, WA 99201 |
Mike Leaming
Tel: 509-328-3371
Fax: 509-328-8224
|
4. Architect/Engineer |
8/13/20 1:13 pm |
Power City Electric
3327 E Olive Ave Spokane, WA 99202 |
Linda Hahn
Project Coordinator
Tel: 509-535-8500 Ext. 1044
Fax: 509-535-8598
|
2. Sub Contractor |
8/12/20 8:57 pm |
Sound Vanguard Solutions
17004 123rd Ave SE Renton, WA 98058 |
Daniel Elam
Owner/Operator
Tel: 206-999-7818
|
2. Sub Contractor |
8/14/20 8:45 am |
Western Systems
1122 Industry St Bldg B Everett, WA 98208 |
Holton Ferguson
Estimator
Tel: 4254381133
|
1. General Contractor 2. Sub Contractor 3. Supplier 4. Architect/Engineer 5. Consultant 6. Other |
8/13/20 7:51 am |
Wm Winkler Co.
5516 N Starr Rd Newman Lake, WA 99025 |
Mat Haneke
Senior Estimator
Tel: 509-489-6100
Fax: 509-484-0646
|
1. General Contractor |