2019 Replacement Well #3 Pump House

The project includes the construction of a new potable water pumping system consisting of a deep well vertical turbine pump installed in a previously constructed well. The pumping system will be in a pre-fabricated concrete building (provided by others). The project includes installation of piping, HVAC, electrical controls, water treatment (chlorination and fluoridation) systems in the pre-fabricated concrete building (provided by others). Site piping includes 4” sanitary sewer, 12” waterline and 16” pump discharge piping.
  Addendum #1 (click to expand/collapse)
Name Size
Addendum 1 7.7 MB
  Addendum #2 (click to expand/collapse)
Name Size
Addendum 2 159.4 KB