2019 Replacement Well #3 Pump House

The project includes the construction of a new potable water pumping system consisting of a deep well vertical turbine pump installed in a previously constructed well. The pumping system will be in a pre-fabricated concrete building (provided by others). The project includes installation of piping, HVAC, electrical controls, water treatment (chlorination and fluoridation) systems in the pre-fabricated concrete building (provided by others). Site piping includes 4” sanitary sewer, 12” waterline and 16” pump discharge piping.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover, Certifications and Table of Contents 590.5 KB
02 - Agency Signiture Page 149.1 KB
03 - Division 00 - Procurement and Contracting Requirements 1.1 MB
04 - Division 01 - General Requirements 216.2 KB
05 - Division 03 - Concrete 238.5 KB
06 - Division 05 - Metals 182.0 KB
07 - Division 09 - Finishes 163.7 KB
08 - Division 10 - Specialties 149.1 KB
09 - Division 22 - Plumbing 370.2 KB
10 - Division 23 - HVAC 528.7 KB
11 - Division 26 - Electrical 215.6 KB
12 - Division 31 - Earthwork 269.1 KB
13 - Division 32 - Exterior Improvements 320.6 KB
14 - Division 33 - Utilities 179.7 KB
15 - City of Cheney Standard Details 1.3 MB
16 - Geotechnical Engineering Evaluation 1.7 MB