2019 Street Preservation Project

The project consists of existing asphalt pavement surface preparation (asphalt patching, crack sealing, curb line grinding), roadway excavation, ADA curb ramp upgrades, asphalt paving and asphalt overlay paving, painted lane striping and pavement markings.
No files available