2019 Street Preservation Project
The project consists of existing asphalt pavement surface preparation (asphalt patching, crack sealing, curb line grinding), roadway excavation, ADA curb ramp upgrades, asphalt paving and asphalt overlay paving, painted lane striping and pavement markings.
Plan Holders
Date | Company | Contact | Bid Categories |
5/16/19 7:17 am |
ConstructConnect
30 Technology Pkwy S Suite 100 Norcross, GA 30092 |
Doc Processing
Tel: 800-364-2059
Fax: 866-570-8187
|
5. Consultant 6. Other |
5/9/19 9:22 am |
Inland Asphalt Company
5111 E Broadway Ave Spokane Valley, WA 99212 |
Tony Via
Tel: 509-534-2657
Fax: 509-536-3137
|
1. General Contractor 2. Sub Contractor |
5/21/19 2:38 pm |
LaRiviere Inc
17564 N. Dylan Ct Rathdrum, ID 83858 |
Kim Sobota
Contract Admin.
Tel: 208-683-2646
Fax: 208-683-0793
|
1. General Contractor |
5/9/19 3:07 pm |
Poe Asphalt Paving, Inc.
2732 N. Beck Road Post Falls, ID 83854 |
Mike Barton
Tel: 208-777-0498
Fax: 208-777-0499
|
1. General Contractor 2. Sub Contractor |
5/11/19 9:03 am |
Shamrock Paving, Inc.
PO Box 19263 Spokane, WA 99219 |
Chuck Green
Tel: 509-244-2800
Fax: 509-244-2949
|
1. General Contractor |
7/15/19 10:08 am |
Shamrock Paving, Inc.
110 N Hayford PO Box 19263 Spokane, WA 99219 |
Chuck Green
Estimator
Tel: 509-244-2800
Fax: 509-244-2949
|
1. General Contractor 2. Sub Contractor |