2019 CDBG Water System Improvements - Cheney
The project consists of the installation of approximately 720 lineal feet of new 8-inch water main in N 3rd Street from Elm Street to Ash Street. The project includes connections to existing 8-inch water mains; installation of a new fire hydrant and water meter with meter box; installation of 12 new 1-inch water service lines between the new main and existing meters and removal and replacement of asphalt paving, concrete curb and sidewalk.
Status
Bidding Closed
Bid Date8/7/19 10:00 am
Company & Contacts
City of Cheney
Todd Ableman tableman@cityofcheney.org (509) 498-9293
Location
Cheney, WA
Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.