2019 CDBG Water System Improvements - Cheney

The project consists of the installation of approximately 720 lineal feet of new 8-inch water main in N 3rd Street from Elm Street to Ash Street. The project includes connections to existing 8-inch water mains; installation of a new fire hydrant and water meter with meter box; installation of 12 new 1-inch water service lines between the new main and existing meters and removal and replacement of asphalt paving, concrete curb and sidewalk.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover and Table of Contents 291.6 KB
02 - Advertisement for Bids 233.9 KB
03 - Proposal 307.5 KB
04 - Contract Forms 214.4 KB
05 - Prevailing Wage Rates 1.2 MB
06 - Required Contract Provisions - CDBG Projects 265.8 KB
07 - Amendments to the Standard Specifications 1.1 MB
08 - Special Provisions 760.2 KB
09 - Appendices 842.2 KB