Public Jobs

Bidding Closed
6/17/20 10:30 am
Supply of Goods and Special Services for a Pile-Cloth Disk Filter
City of Cheney
Cheney, WA
This work is for the supply of a pile-cloth disk filter for an upgrade to the City’s Wastewater Treatment and Reclamation Plant (the Site). The Work includes: fabrication and delivery of the filter and ancillary components, process instrumentation, and control panel; furnishing design and operation documentation; on-site start-up, testing, and training; and post-commissioning assistance. The work is to be performed between June 2020 and September 2022. The City will execute this procurement contract with the filter Seller. The materials and equipment to be provided through the procurement contract are to be furnished and delivered to the Site for installation by the City’s Contractor.
Bidding Closed
6/17/20 10:00 am
Supply of Goods and Special Services for an Ultraviolet Disinfection System
City of Cheney
Cheney, WA
This work is for the supply of an ultraviolet disinfection system for an upgrade to  the  City’s  Wastewater  Treatment  and  Reclamation  Plant  (the  Site).  The  Work  includes:  fabrication and delivery of ultraviolet disinfection system equipment and ancillary components, process instrumentation, and control panel; furnishing design and operation documentation; on-site start-up, testing, and training; and post-commissioning assistance. The work is to be performed between June 2020 and September 2022. The City will execute this procurement contract with the ultraviolet disinfection system Seller. The materials and equipment to be provided through the procurement contract are to be furnished and delivered to the Site for installation by the City’s Contractor.
Bidding Closed
6/3/20 10:00 am
Washington Street Preservation Project
City of Cheney
Cheney, WA
The project consists of existing asphalt pavement surface preparation (asphalt patching, crack sealing, curb line grinding), roadway excavation, ADA curb ramp upgrades, asphalt paving and asphalt overlay paving, painted lane striping and pavement markings on Washington Street between W 6th Street and Oakland Street (extended).
Bidding Closed
8/7/19 10:00 am
2019 CDBG Water System Improvements - Cheney
City of Cheney
Cheney, WA
The project consists of the installation of approximately 720 lineal feet of new 8-inch water main in N 3rd Street from Elm Street to Ash Street. The project includes connections to existing 8-inch water mains; installation of a new fire hydrant and water meter with meter box; installation of 12 new 1-inch water service lines between the new main and existing meters and removal and replacement of asphalt paving, concrete curb and sidewalk.
Bidding Closed
5/22/19 10:00 am
2019 Street Preservation Project
Parametrix
Cheney, WA
The project consists of existing asphalt pavement surface preparation (asphalt patching, crack sealing, curb line grinding), roadway excavation, ADA curb ramp upgrades, asphalt paving and asphalt overlay paving, painted lane striping and pavement markings.
Bidding Closed
3/7/19 10:00 am
2019 Replacement Well #3 Pump House
Parametrix
Cheney, WA
The project includes the construction of a new potable water pumping system consisting of a deep well vertical turbine pump installed in a previously constructed well. The pumping system will be in a pre-fabricated concrete building (provided by others). The project includes installation of piping, HVAC, electrical controls, water treatment (chlorination and fluoridation) systems in the pre-fabricated concrete building (provided by others). Site piping includes 4” sanitary sewer, 12” waterline and 16” pump discharge piping.
Bidding Closed
2/21/19 11:00 am
2019 Well One Rehabilitation
City of Cheney
Cheney, Eastern WA
The Objective of the Cheney Well One Rehabilitation Project is to improve and enhance the efficiency of the well through rehabilitation of the well’s mechanical components.
Bidding Closed
2/8/19 10:00 am
Well House Three Prefabricated Building
City of Cheney
Cheney, WA
The Well Three Well House Prefabrication Building will consist of up to 3 prefabricated concrete modular building sections constructed from an offsite manufacturing company and delivered to Cheney’s Well Three location.